Product Description
Ring Structure Piezoelectric Force Sensor
A cutting-edge force sensor designed for dynamic measurement response and static calibration. This ring structure sensor eliminates the need for power, as it operates with a charged amplifier. Made from durable stainless steel material, it offers a capacity of 0-5kN and features a thru hole φ4 installation for easy setup. With a charged sensitivity of approximately 4pC/N and a resonant frequency exceeding 75kHz, this sensor is ideal for precise and efficient force measurement applications. Upgrade your measurement capabilities with the Ring Structure Piezoelectric Force Sensor.
Detailed Photos

Product Parameters
Static Parameters |
|
Charged sensitivity(20±5ºC) |
~4pC/N |
Measurement range |
0~5kN |
Overload capacity |
120 % |
Linearity |
≤1%F·S |
Hysteresis |
≤1%F·S |
Repeatability |
≤1%F·S |
Capacitance |
~6.8pF |
Insulation resistance |
>1013Ω |
Dynamic Parameters |
|
Resonant frequency |
>75kHz |
Operating Temp. range |
-54~+120 ºC |
Physical Parameters |
Weight |
4 g |
Housing material |
Stainless steel |
Installation |
Thru hole φ4 |
Sensitive material |
Quartz |
Output method |
Side L5 |
Attachment |
|
Connection cable |
Double-ended L5 low-noise cable x 2m |
Company Profile


Certifications

Packaging & Shipping

FAQ
Q: How can I get the quotation?
Please send your inquiry to us.
Click 'Contact Supplier' icon which is on the right-side or write down your requirement at the bottom of this page.
Q: What detailed information do I need to provide if I want to place an order?
We need to know the following information: Capacity, Usage and other related parameters you need.
Q: Do you have any discount?
Yes, we take bulk order, if you buy large QTY, please send us inquiry, we can discuss the price.
Q: Can I get samples?
Yes, if you have the follower orders, we could offer the samples or free samples for you.
Q: How about the quality of the products?
We have the certification of CE and RoHs , also we are the ******'s verified supplier, you don't have to worry about this.
Q: When will you arrange the production?
We will arrange the production immediately after receiving your payment.
Q: Could you provide me the shortest lead time?
We have materials in our stock, if you really need, let's discuss and we will try our best to satisfy you.